NEWS

The 64000 DWT large wheel leaves Shipyard for the sea trail!

TIME:2020-03-20 10:14AUTHOR:Wuhu Shipyard VIEWS:0

At 7:58 on the March 15th, Ningbo Juhe Logistics Co., Ltd.'s 64000 DWT bulk carrier "JU HE PU DU", which was built by Wuhu Shipyard, left the company's outfitting wharf, entered the river and sea, and was at the beginning of sea trial and delivery.


This is the third ship newly built by Wuhu Shipyard, since the work resumption, which is the prelude to sea trials and delivery.

000.jpg111.jpg

222.jpg

△The "JU HE PU DU" has a length of 209.9 m, a width of 36 m, a depth of 18 m, and a design draught of 11.3m. The ship is a single machine, single slurry and single shell, suitable for domestic coastal navigation, and can carry a variety of such bulk cargoes as dry bulk cargo, general cargo, as well as packaged cargo.

333.jpg

△Wuhu STV News report the interview with the company ’s Deputy Secretary Pan Yuhong.

444.jpg

According to the itinerary plan, " JU HE PU DU " will pass the Nanjing Yangtze River Bridge at about 11 am on the 16th. Best wishes to "JU HE PU DU" to cross the bridge smoothly and safely!